Skip to content

Quick Start

This chapter helps you complete the first connection and system login for A8625MY1 in 10 minutes.

Prerequisites

Required ItemDescription
A8625MY1 core board + debug baseboardComplete power-on and debug connection
USB Type-C data cableUsed for ADB debugging (must support data transfer)
12V DC power adapter12V/3A recommended, center positive
Host (Windows/Linux/macOS)ADB and SSH clients preinstalled are recommended

Getting Started Workflow

  1. Hardware connection - Complete core board, adapter board, and power wiring.
  2. Driver and network preparation - Complete driver installation and network configuration.
  3. ADB login - Access the system through USB debugging link.
  4. SSH login - Log in remotely over the network for development and debugging.

Common Issues

If you encounter connection failures, unrecognized devices, or network issues, check: